SUMMARIES
Weekly Summary ALL Summaries
(index of directories)
Test and Channel Summary (EXCEL)
IV-Scans
Defective Hybrid Summary
Progress Summary
Monthly US Module Barrel Summary (November, 2004)
SHIPMENTS

TEST RESULTS
Hybrids-Modules at LBNL Hybrid at Scipp

ANALYSIS
Hybrid Wafer Comparison Data: Default Comparison All files
Gel-pak analysis LBL UCSC
Large Gain Spread Study: Vcc, Gain, ISH |excel
Icc Study |excel
DAC Study |excel
TALK - SCT June03
NOcc/Oscillation Study: Report (May 03) excel with NO-Scurves plots
Parameters Studies-Correlations
Derivative of the Delta of log(Occ) (June 03)
Binomial fit of hit distribution(July 03)
2Derivative plot | Residuals plot
Software (sctdaq) Update
Code

TALKS - SCT Sept03
Oscillation
Binomial Test

Block Low Gain - SD Study: BLG-Noise Peak
BLG

REPORT (Oct 03)

TALK - SCT Dec03

USA Module Production Status

PPT | PDF

D O N E ! ! !

Cap Correction Factors | By Lot | By Wafer


AC