USA Site Qualification Request

Overview

The following documents and information form the basis of the USA request to be approved for Series Barrel Module Production.
They are provided below following the format given in the "Barrel Module Assembly Site Qualification Procedures and Criteria"
(PDF | MS-Word format).

1. Named Personnel for the USA Barrel Module project

Cluster Responsible:

C. Haber

Cluster Quality Control:

A. Ciocio / V. Fadeyev

Qualified teams exist for module assembly and metrology (LBL), hybrid assembly (LBL and UC Santa Cruz),
and electrical testing (LBL and UC Santa Cruz):

LBL:

A. Ciocio, V. Fadeyev, M.Gilchriese, F.Goozen,C.Haber, B.Jayatilaka, T.Johnson, J.Lys, S.McIntyre, F.McCormack, C.Tran, T. Weber, R.Witharm, L.Zimmerman

UC Santa Cruz:

M.Anderson, A.Grillo, F.Rosenbaum, W. Rowe, A.Seiden

Details of this work can be found in this document: PDF | MS-Word format.

An overview of the USA module QA is given here: PDF | MS-Word Format.

2. Steps to have been Completed

Production of 5 electrical modules, satisfying every aspect of the electrical and mechanical specifications listed
in SCT-BM-FDR4 and SCT-BM-FDR7. For the summary, including yield, see:

3. Documentation

3(a). Manuals for Operator Use

Additional supporting information:

3(b). Batch traveller procedure

3(c). Procedure for Component Accountability and Yield Statistics

3(d). Visibility of Results to All Barrel Sites

All results for hybrids and modules are visible on the web at:
http://www-atlas.lbl.gov/strips/modules/production.html

4. Required Facilities

The appropriate facilities (see Fred Goozen's Pages) are now in place and include: